
- 17年团队经验
- 书面分项报价
- 客户五星好评
- 免费上门估价
门窗更换
服务内容
服务 Bellevue 各社区,包括 Somerset, Lake Hills, Newport Hills, Crossroads, Factoria, West Bellevue, Bridle Trails, Eastgate, Wilburton, Woodridge, Enatai, Lakemont, Robinswood, Cougar Mountain.
- 窗户更换
- 入户门与庭院门
- 室内门
- 内外装饰线
装修前后对比
装修前后效果示例


施工流程
全程透明,没有意外
- 01
免费上门评估
上门测量,了解需求,如实沟通方案和预算。
- 02
书面分项报价
范围、材料、价格、工期逐项写清楚,不含糊。
- 03
施工与进度沟通
固定施工团队,每天收工清理现场,定期汇报进度。
- 04
验收与售后
完工后陪同验收,发现问题及时处理。完工之后,有事依然随叫随到。
客户评价
听听业主怎么说
- ★★★★★厨房翻新
“I bought a house and wanted to have the kitchen remodeled. The day I got the keys, the workers started and were done in exactly 3 weeks! I worked with them to pick out the colors, materials, and designs I wanted. They helped me install all new cabinets, counter tops, and a sink. We discovered there was a grease stain on the ceiling from the previous stove location, so they also repainted the whole ceiling! Small issues I noticed afterwards were also fixed quickly and carefully.”
jeffchen711 · 2026年1月
- ★★★★★房屋装修
“特意申请的账号来评论。推荐诚信装修,王师傅很靠谱、负责,团队很专业。我一共面试了5家,只有他家完全复合我的要求:价格合适、license齐、项目合同写的清清楚楚。很正规。”
9636好彩自然来 · 2023年12月
- ★★★★★全屋翻新
“王师傅非常好沟通,工程负责,员工也非常热心和负责!最让我满意的一点就是工程材料非常让人放心,没有任何偷工减料的情况出现。家里有两个小朋友,我非常担心装修材料和甲醛不安全之类的,装修完的新房毫无异味和粉尘,清理的非常干净,直接搬进来就住了。我还买了甲醛和空气质量测量仪,全部空气指标达标。”
ZAX · 2020年12月
以下评价来自我们团队过往项目的客户。 评价来自 SeattleChinaRen.
常见问题
在 Bellevue 换窗需要许可吗?
同尺寸、原位置更换不需要。新增、移动或加宽外窗和外门需要带图纸审核的许可。
估价真的免费吗?
是的。我们上门测量并提供书面分项报价,不收费,也没有任何义务。
服务哪些地区?
贝尔维尤、雷德蒙德、柯克兰、萨马米什、伊瑟阔、默瑟岛、纽卡斯尔、伦顿、博塞尔、西雅图。Bellevue 各社区均可服务。
可以用中文沟通吗?
可以,我们提供中文和英文服务。






