Skip to content
True Level Remodeling
← All guides

Planning

How to Compare Three Remodeling Quotes in Bellevue, WA

Three remodeling quotes, three different totals? Learn to line them up item by item: scope, allowances, permits, schedule, payments and change orders.

By Shawn, True Level Remodeling阅读中文版

Illustrative rendering: three printed remodeling quotes fanned out on a wooden table with a highlighter, a pen, tile and wood samples and a cup of tea, beside a rain-streaked window

To compare remodeling quotes fairly, don’t start with the totals. Put the quotes side by side and check that each one covers the same scope, uses the same allowances for materials, says who handles permits, and lays out the schedule, payment terms and change-order process. The lowest number often just leaves something out.

Here’s how to line them up, what each section should say, and the warning signs to watch for.

What should you compare, line by line?

Make a simple table with a row for each item and a column for each contractor. If a quote doesn’t mention an item, write “not stated” and ask.

Item What to look for
Scope of work Every room and task listed: demolition, framing, plumbing, electrical, drywall, tile, paint, trim, cleanup
Materials Specific products and models, or clearly stated allowances
Allowances Dollar amounts for items you’ll choose later (tile, fixtures, lighting, cabinets)
Permits Which permits, who applies, and whether fees are included
Subcontractors Which trades are in-house and which are subcontracted
Schedule Start date, rough duration, and what can delay it
Payment schedule Deposit, progress payments tied to milestones, final payment
Change orders How changes are priced and approved, in writing
Exclusions What’s not included (hidden damage, hauling, appliance install, painting)
Warranty What is covered, for how long, and in writing
Cleanup and protection Dust protection, daily cleanup, debris removal

Is every quote pricing the same project?

This is the most common problem. One contractor includes moving a drain, new lighting and painting; another quotes “remodel bathroom” in one line. Before comparing prices:

  1. Write your own scope list of what you want done.
  2. Send the same list to every contractor.
  3. Ask each one to price that list, and to call out anything they’d change or add.

Line-item quotes make this much easier. A single lump-sum price makes it almost impossible to tell what you’re paying for.

What are allowances, and why do they matter?

An allowance is a placeholder amount for something you haven’t picked yet, for example “$2,000 tile allowance.” If your final choice costs more, you pay the difference.

Allowances are normal, but they can make a quote look cheaper than it is. If one quote has a low tile allowance and another a realistic one, the totals aren’t comparable. Ask:

  • Is the allowance for material only, or material and labor?
  • Is it realistic for the quality you want?
  • How is the difference handled if you go over or under?

To compare fairly, ask every contractor to use the same allowance amounts.

Who handles permits?

Most kitchen and bathroom remodels need at least one permit. In Bellevue, showers, bathtubs, moved fixtures and new circuits all need permits; our Bellevue permit guide lists them. A quote should say:

  • Which permits the project needs
  • Who applies for them and schedules inspections
  • Whether permit fees are included or billed separately

Be cautious with a quote that suggests skipping a required permit to save time or money. Unpermitted work can cause problems with insurance, inspections and the eventual sale of the house.

How should the payment schedule look?

Payments should follow progress, not get ahead of it. A clear schedule:

  • Starts with a reasonable deposit
  • Ties each payment to a milestone you can see (demolition done, rough-in inspections passed, cabinets installed, tile complete)
  • Holds back a final payment until the punch list is done

Be wary of a request for most of the money up front, or for payment in cash only with no written receipt.

How are changes handled?

Every remodel has changes: something found behind a wall, or a choice you make along the way. A good quote explains the change-order process:

  • Changes are written down and priced before the work is done.
  • You approve them in writing.
  • The quote says how hidden conditions (rot, old wiring, plumbing surprises) will be handled and priced.

In older homes this matters even more. See what to check before remodeling an older home.

What does each quote leave out?

Read the exclusions as carefully as the inclusions. Common ones:

  • Repair of hidden damage
  • Appliance delivery and installation
  • Painting, or patching outside the work area
  • Debris hauling and dumpster fees
  • Moving furniture and contents

Two quotes with different exclusions are pricing two different jobs.

What questions should you ask each contractor?

Ask every contractor the same questions and write the answers next to their quote. How they answer tells you as much as the price.

  1. Who will be on site day to day, and who is my main contact?
  2. Which trades are your own crew, and which are subcontracted?
  3. When could you start, and how long will the work take once it begins?
  4. What could delay the schedule: permits, inspections, special-order materials?
  5. What happens if you find damage behind a wall or under the floor?
  6. How will you protect the rest of the house from dust, and where will materials and debris go?
  7. Which selections do I need to make before you start, and by when?
  8. How do you handle a change I want halfway through?
  9. What does your warranty cover, and is it in writing?
  10. Can I see the contract before I commit?

A contractor who answers clearly and in writing will usually run the job the same way.

How do you read the schedule?

A schedule in a quote is an estimate, but it should be specific enough to plan around:

  • A start window, not just “soon”
  • The duration once work begins, and which phases will leave a kitchen or bathroom unusable
  • Lead times for cabinets, windows, glass or special-order tile, which often set the real start date
  • Inspection points, since work can’t be closed up until an inspector signs off

If two quotes are close in price but one has a clear schedule and the other doesn’t, that difference is worth weighing.

What are the red flags?

  • A one-line quote with no breakdown
  • A price far below the others with no clear reason
  • Pressure to sign today for a special discount
  • No written contract, or a contract that doesn’t match the quote
  • Vague answers about permits, schedule or who will be on site

Frequently asked questions

Should I just pick the middle quote? Not automatically. First make sure all three price the same scope and allowances. After that, compare clarity, schedule and how each contractor answered your questions, not just price.

Is it OK to share one contractor’s quote with another? You can share your own scope list. Sharing another company’s pricing doesn’t help you get a better-defined quote.

How many quotes should I get? Three is common. It’s enough to see a range without spending weeks on meetings.

Get an itemized quote from us

We give free on-site estimates for kitchen remodeling, bathroom remodeling and more in Bellevue and the Eastside. Our quotes are written and itemized, so you can line them up against any other quote you get. Request your free estimate.

CallFree estimate