Skip to content
True Level Remodeling
← All guides

Planning

Roof Replacement in Bellevue, WA: What a New Roof Includes

Replacing a roof in Bellevue, WA? See what a full tear-off includes, when a new layer over the old one is allowed, and the flashing and venting to check.

By Shawn, True Level Remodeling阅读中文版

Illustrative rendering: a gray two-story house mid roof replacement on an overcast day, with one section torn off to bare plywood, gray underlayment nailed along the eave, new charcoal shingles on the rest of the roof, a folded blue tarp and a wrapped bundle of shingles near the dormer, a ladder at the gutter and a dumpster of old shingles on the driveway

A roof replacement in Washington means removing the old roofing down to the roof deck, repairing damaged sheathing, then installing new underlayment, drip edge, flashing, shingles and attic ventilation. A new layer over the old roof (a “recover”) isn’t allowed if the existing roof is water soaked or deteriorated, is slate or tile, or already has two or more layers.

Those rules come from the 2021 International Residential Code, which Washington adopts statewide (WAC 51-51-003, checked November 2026). Knowing them makes it easier to compare roofing quotes line by line.

What does a roof replacement include?

A full replacement covers every layer from the deck up, not only the shingles you can see. Use this table to check that a quote covers each part:

Part What’s done What to look for in the quote
Tear-off Old shingles and underlayment removed down to the deck Number of existing layers, disposal
Roof deck Soft or rotted sheathing replaced How deck repairs are priced (per sheet or included)
Underlayment New felt or synthetic sheet over the whole deck Type of underlayment; extra layers at low slopes and valleys
Drip edge Metal edge at eaves and rakes Listed as new, not reused
Flashing Walls, chimneys, skylights, valleys, vent pipes Which flashings are replaced, and how
Shingles and ridge New shingles, starter course, ridge cap Product line and color
Ventilation Intake at the eaves, exhaust at or near the ridge Whether venting is checked and changed
Cleanup Debris removed, nails swept from the yard Gutter cleaning, magnet sweep

If a line is missing, ask whether it’s included or simply not written down.

Tear-off or a new layer over the old roof?

The code’s default is a tear-off: “Roof replacement shall include the removal of existing layers of roof coverings down to the roof deck” (2021 IRC R908.3). A recover is the exception, and it’s not allowed in three cases (R908.3.1.1):

  1. The existing roof “is water soaked or has deteriorated to the point that” it isn’t adequate as a base.
  2. The existing roof is “slate, clay, cement or asbestos-cement tile.”
  3. The existing roof “has two or more applications of any type of roof covering.”

Even when a recover is allowed, a tear-off is usually the better choice in a wet climate, because it’s the only way to see the deck. The code also says existing flashings, edgings, vents and similar parts “shall be replaced where rusted, damaged or deteriorated” (R908.5). You can read these sections in the 2021 IRC, Chapter 9 (checked November 2026).

In Bellevue, a recover needs a building permit only if it adds more than 5 percent to the roof’s total weight (City of Bellevue roofing policy, checked November 2026). Our guide to whether a leaking roof needs a repair or a replacement covers that decision.

What happens to the roof deck?

Asphalt shingles must be fastened to solid sheathing, so damaged or gapped decking is fixed before anything new goes on (R905.2.1). The deck usually can’t be judged until the old roof is off. Common findings:

  • Soft or rotted sheathing, often under old leaks, at the eaves or around chimneys.
  • Spaced boards (skip sheathing) in older houses that once had cedar shakes. Shingles need a solid deck over them.
  • Delaminated plywood from years of attic moisture.

Bellevue’s policy says a house roof replacement needs no building permit if the replaced sheathing “is limited to five (5) four-foot by eight-foot sheets.” Beyond that, a permit is required. If the roof cavity is opened, the energy code requires it to be insulated to full depth, with an air gap under the sheathing on a vented roof. Ask how the quote handles deck repairs you can’t see yet.

What goes under the shingles?

Underlayment, drip edge and, on some roofs, extra membrane at the eaves are what keep water out when shingles lift or wear. The 2021 IRC sets these rules for asphalt shingles:

  • Underlayment must carry a label showing it meets the standard it’s made to (R905.1.1).
  • Slope: asphalt shingles need a slope of at least 2 in 12. Between 2 in 12 and 4 in 12, “double underlayment application is required” (R905.2.2).
  • Drip edge is required “at eaves and rake edges.” Pieces overlap at least 2 inches, extend at least 1/4 inch below the sheathing and are fastened at no more than 12 inches apart. Underlayment goes over the drip edge at the eaves and under it at the rakes (R905.2.8.5).
  • Ice barrier at the eaves is required where the local design table records “a history of ice forming along the eaves” (R905.1.2). Ask your roofer whether it applies, and whether they add self-adhering membrane in valleys or around penetrations anyway.

Where does the roof need new flashing?

Flashing goes “at wall and roof intersections, wherever there is a change in roof slope or direction and around roof openings” (R903.2.1). Most leaks start at one of these spots:

  • Sidewalls: step or continuous flashing at least 4 inches high and 4 inches wide, with the vertical leg “continuous under the siding” (R905.2.8.3). If the siding is coming off too, see siding: repair or replace.
  • Chimneys: a chimney or other penetration more than 30 inches wide needs a cricket (a small peaked diverter) on the uphill side (R903.2.2).
  • Valleys, vent pipes and skylights: lined or flashed to the shingle maker’s instructions.

When reroofing, “flashings shall be reconstructed in accordance with approved manufacturer’s installation instructions” (R908.6).

Why does attic ventilation matter?

A vented attic needs enough airflow to carry moisture out; the code’s minimum is 1/150 of the attic floor area in net free vent area (R806.2). It can drop to 1/300 when the vents are balanced between high and low and the other conditions in the exception are met. Insulation must leave at least a 1-inch air space under the sheathing at the vents (R806.3).

In a Bellevue winter, poor venting shows up as frost or dark stains on the underside of the sheathing and a musty attic. A replacement is the easiest time to add ridge or eave vents. Check that bathroom fans run outside, not into the attic; Washington requires them to be ducted outdoors (see our small bathroom remodel guide).

What about moss and gutters?

Moss holds water against shingles, so remove it and keep shaded slopes clear after the new roof goes on. If moss treatments are used, King County’s stormwater manual says to “disconnect the downspouts so the chemicals do not discharge to the stormwater drainage system” and to let the water soak into lawn or landscaping instead (King County Stormwater Pollution Prevention Manual, R-6, checked November 2026).

Gutters sit right below the drip edge, so decide before work starts whether they’ll be cleaned, rehung or replaced.

What happens on the day?

A typical tear-off goes in this order, one section at a time:

  1. Confirm whether a permit is needed, and who pulls it.
  2. Protect landscaping, siding and windows; set up a dumpster.
  3. Tear off one section down to the deck.
  4. Inspect and replace damaged sheathing.
  5. Install drip edge at the eaves, underlayment, then drip edge at the rakes.
  6. Install flashing, then shingles from the eaves up, then ridge vents and caps.
  7. Cover anything not finished before the crew leaves.
  8. Clean up, sweep for nails and walk the roof with you.

In the rainy season, the crew only opens what it can dry in the same day; our leak guide explains how winter changes the schedule. Washington also requires asbestos to be identified before any repair or demolition project, so an older roof may need testing first; see remodeling an older Bellevue home.

Common questions

Can new shingles go over my old roof? Only if the existing roof is sound, isn’t slate or tile and has fewer than two layers. Even then, a tear-off lets the crew inspect and repair the deck.

Do I need a permit to replace my roof in Bellevue? Not for a house roof where replaced sheathing is limited to five 4 × 8 sheets. More sheathing than that, or a recover that adds more than 5 percent to the roof’s weight, needs a permit.

Is attic ventilation part of a roof replacement? It should be checked. The code minimum is 1/150 of the attic area in vent openings, or 1/300 under the exception, and a replacement is the easiest time to correct it.

Plan your roof replacement with us

We give free on-site estimates for roof replacement and repair in Bellevue and the Eastside. We look at the roof and the attic, and give you a written, itemized quote that lists scope, permits and schedule line by line. Request your free estimate.

CallFree estimate